 |
Materials Checklist
|
1. |
Rail Cover |
|
2. |
Rail |
|
3. |
Rail bracket |
|
4. |
Hanger |
|
5. |
Steel lateral |
|
6. |
Prefinished steel vertical |
|
7. |
Door covering/siding |
|
8. |
Guide rail bracket |
|
9. |
Guide rail |
|
*10. |
Center guide & stop (for bi-parting doors) |
|
*10a. |
Center guide (for larger, single doors) |
|
*11. |
Door stop (bottom mount) |
|
*11a. |
Door stop (jamb mount) |
|
*12. |
Jamb latch |
|
*12a. |
Center door latch (for bi-parting doors) |
|
*13. |
Door pull |
|
*14. |
Door Astragal |
*Note: These items are not shown in the diagram, but are required for a complete door system installation.

TAB-LOC Lets one man assemble a steel door frame in 10 minutes. The secret is the exclusive, patented locking tabs found only from National. These built-in fasteners are pre-punched into the frame members. Just bend the tabs down into matching slots for a square, tight, permanent steel door frame. Unlike any other door frame, you don't even need a level area for assembly. Once you're familar with TAB-LOC, 10 minutes is all it takes to get a frame ready to attach the siding. In fact, the door can be comleted and hung in under an hour to previously installed rail.
|
|
|
Click for larger image
TO SHORTEN DOOR LATERAL Cut off desired amount and replace the square hole lost in the cut-off with 7/8 in. diameter round hole.
|
|
Click for larger image
TO SHORTEN DOOR VERTICAL Extra tabs on both ends allow shortening in 1 1/2 in. increments up to 12 inches.
|
|
NOTE:
#6025 kit includes: 3 - 6005 brackets 3 - 3/8" bolts, nuts, washers 6 - 5/16" x 2 1/4" bolts, nuts, washers
#6026 kit includes: 5 - 6005 brackets 5 - 3/8" bolts, nuts, washers 10-5/16" x 2 1/4" bolts, nuts, wahsers
|
APPLICATIONS FOR INSTALLING SLIDING DOOR ON BUILDING After door frame has been completely assembled, fasten siding to frame. Install hangers and hang door.
|
|